Simulation – Nova Scotia, Canada
Status
Completed
Building Type
Condominium
Application
Energy Arbitrage; Microgrid; Peak Shaving; Critical Load Backup
Capacity
40-100kW / 100-200kWh
Problem
A condominium complex needed to ensure uninterrupted power for critical loads during emergencies while integrating renewable energy sources and preparing for future electric vehicle charging needs.
Solution
TROES devised a comprehensive microgrid system with solar panels, a Battery Energy Storage System (BESS), providing extended backup power, optimizing costs, accommodating future expansion for electric vehicle charging stations, and enabling electricity export to sell to the grid.