St. Catharines, Ontario, Canada

Image
Status

Under Delivery

Cabinet Type

Outdoor Cabinet

Application

Back-Up Power

Capacity

500kW/560kWh 

Problem

The client faces a challenge to support its loads of 2.3MW, typically backed by cogeneration plants. Their reliance on those generators has fuel costs and environmental implications.

Solution

TROES is integrating a 560kWh Battery Energy Storage System (BESS) within the microgrid to support critical loads during grid failures, eliminating the need for multiple generators.

Work with TROES


Power your next project using energy storage. Our Sales and Engineering team will work with you to find out if energy storage makes financial and economical sense.