Thorold, Ontario

Image
Status

Under Construction

Cabinet Type

x2 Outdoor Containers

Application

Peak Shaving

Capacity

150kW/492kWh

Problem

An industrial factory in Thorold has unnecessary high electricity bills due to peak demand times requiring higher than average supply levels.

Solution

A battery energy storage and PCS are used to manage and curb the peak demand resulting in lower monthly costs.

Why TROES?

TROES was chosen for our remote monitoring system and local battery controller that is able to work smoothly with the client’s management system. As well, our highly modular design helps clients avoid paying extra costs for oversized systems.