British Columbia, Canada

Scenic view of Fairmont Empress Hotel with yachts moored at Victoria Harbor BC Canada
Status

Under Delivery

Cabinet Type

TBD

Application

Peak Shaving

Back-Up Power

Capacity

30kW / 180kWh 

Problem

An education institution needed a solution to reduce peak electricity demand on campus and avoid high demand charges.

Solution

A 30kW / 180kWh Battery Energy Storage System paired with a microgrid controller to enable load-follow dispatch and effectively manage peak periods.

Contact TROES


Reach out to TROES for inquiries, partnerships, and support with our innovative energy storage solutions.